Starting in the late “70’s”, GIBCA participated in the delivery of a
turnkey 300 MW Power Station and 2 MIGD desalination plant, the core
of the first major central power station in Abu Dhabi. Following
this GIBCA was directly contracted the turnkey design and
construction of 60 MW Power Station with an integrated 33 KVA
substation/distribution network in the early “80’s” which lead to
the incorporation of GIBCA Energy.
Since inception, GIBCA Energy has played a
major role in the UAE’s infrastructure projects mainly in the
production and delivery of electric energy. Our reference in this
field covers a wide spectrum from simple cycle power stations in
remote areas, to Mobile Gas Turbine Generating sets, to Gas Turbine
Generating packages powering central and satellite platforms at
offshore oilfields, to Desalination plants and large central
Cogeneration Power Plants, while on the energy delivery side it
includes supply & installation of MV & HV cables, first 400KV XLPE
Cable link in the UAE and HV Submarine Cable circuits. GIBCA Energy
has assisted its principals in the finalization of over $ 4 billion
of awarded contracts for delivery and ongoing development of 5000
plus MW of generated power and over 300 MIGD of desalinated water.
With a proven track record, expertise and a
dedicated professional management team, GIBCA Energy continues to
offer commercial advice and assistance in structural finance,
engineering, and logistics. GIBCA Energy has and continues to
strive to convert its resources into building the national
infrastructure.